{"id":2922,"date":"2025-10-15T16:29:05","date_gmt":"2025-10-15T13:29:05","guid":{"rendered":"https:\/\/worktrust.gr\/?post_type=thesi&#038;p=2922"},"modified":"2025-10-20T12:21:17","modified_gmt":"2025-10-20T09:21:17","slug":"telecommunications-field-technician-llu-ftth-chalkida-evia","status":"publish","type":"thesi","link":"https:\/\/worktrust.gr\/en\/thesi\/telecommunications-field-technician-llu-ftth-chalkida-evia\/","title":{"rendered":"Telecommunications Field Technician \u2013 LLU &amp; FTTH | Chalkida &amp; Evia"},"content":{"rendered":"\n<p>A company active in the telecommunications infrastructure sector is seeking a Field Technician to support and implement fiber optic (FTTH) projects in Chalkida and the wider Evia region.<\/p>\n\n\n\n<p><strong>Responsibilities<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Execution of LLU assignments (copper line checks, activations\/restorations)<\/li>\n\n\n\n<li>FTTH installation tasks (drop cable installation, optical fiber terminations\/splicing, ONT\/CPE setup, GPON activations)<\/li>\n\n\n\n<li>Power Meter measurements and basic documentation (photos\/logs)<\/li>\n\n\n\n<li>Communication with the coordination center and adherence to SLA requirements<\/li>\n\n\n\n<li>Participation in on-call shifts when required<\/li>\n<\/ul>\n\n\n\n<p><strong>Required Qualifications<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Compliance with PPE (Personal Protective Equipment) regulations and basic Health &amp; Safety certifications (preferred advantage)<\/li>\n\n\n\n<li>Good use of smartphone\/apps for task management and reporting<\/li>\n\n\n\n<li>Completed military service (for male candidates)<\/li>\n<\/ul>\n\n\n\n<p><strong>Desired Skills (Nice to Have)<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Basic understanding of technical English terminology<\/li>\n<\/ul>\n\n\n\n<p><strong>Benefits<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Stable workload and long-term collaboration opportunities<\/li>\n\n\n\n<li>Competitive salary package<\/li>\n\n\n\n<li>Training and briefing on project procedures and tools<\/li>\n<\/ul>\n\n\n\n<p><strong>Coverage Area<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Chalkida and the wider Evia region<\/li>\n<\/ul>\n\n\n\n<p><\/p>\n","protected":false},"featured_media":2915,"template":"","meta":{"_acf_changed":false},"klados":[59],"area":[63],"class_list":["post-2922","thesi","type-thesi","status-publish","has-post-thumbnail","hentry","klados-telecommunication","area-chalkida-2"],"acf":[],"_links":{"self":[{"href":"https:\/\/worktrust.gr\/en\/wp-json\/wp\/v2\/thesi\/2922","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/worktrust.gr\/en\/wp-json\/wp\/v2\/thesi"}],"about":[{"href":"https:\/\/worktrust.gr\/en\/wp-json\/wp\/v2\/types\/thesi"}],"version-history":[{"count":1,"href":"https:\/\/worktrust.gr\/en\/wp-json\/wp\/v2\/thesi\/2922\/revisions"}],"predecessor-version":[{"id":2923,"href":"https:\/\/worktrust.gr\/en\/wp-json\/wp\/v2\/thesi\/2922\/revisions\/2923"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/worktrust.gr\/en\/wp-json\/wp\/v2\/media\/2915"}],"wp:attachment":[{"href":"https:\/\/worktrust.gr\/en\/wp-json\/wp\/v2\/media?parent=2922"}],"wp:term":[{"taxonomy":"klados","embeddable":true,"href":"https:\/\/worktrust.gr\/en\/wp-json\/wp\/v2\/klados?post=2922"},{"taxonomy":"area","embeddable":true,"href":"https:\/\/worktrust.gr\/en\/wp-json\/wp\/v2\/area?post=2922"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}